Industrial inspection

Basic flying, then solar, electrical, wind, structures and bridges.

36 lessons, then one final test with one attempt.

Set the conditions.

The instructor sets the conditions for each lesson.

Available

Wind
Speed and direction around the tower, the line or the turbine.
Gusts
How hard the wind gusts, close to the structure.
Flight mode
From the easy Loiter mode to fully manual.

Weather and temperature.

Every session starts from the exercise’s default. The pilot then changes it.

Available

Weather
Sunny, cloudy, or light, moderate or heavy rain.
Temperature
From −20 to 50 °C. Hot air gives less lift and a shorter battery; cold makes the battery weaker.
Wind
Speed, direction and gusts in every area.
The drone’s limits
Each drone has its maker’s wind, rain and temperature limits. Past them, the pilot is warned.

BVLOS operation.

Fly this area out of sight. The drone camera is the only view: you find your way by the numbered markers and the line in the picture.

Available

  1. I1Power-line patrol out of sight
  2. I2Link lost beside the line
  3. I3GPS weak near the steel
  4. I4Inspection out of sight: final test
Camera only
No view from the ground or from behind. Distance home, height, battery and link on screen.
Its own exercises
Out-of-sight exercises only, with their own final test.
Its own record
Kept apart from the area’s normal training.

The lessons.

basics

  1. I01Site familiarisation
  2. I02Tower orbit at a safe stand-off
  3. I03Tower climb inspection
  4. I04Power-line follow
  5. I05Pylon detail photographs
  6. I06Solar row scan
  7. I07Storage tank perimeter and roof
  8. I08Building facade grid
  9. I09Close hover beside the tower in gusts
  10. I10Inspection mission assessment

solar

  1. S1Solar visual survey
  2. S2Solar thermal survey
  3. S3String and module faults
  4. S4Mixed solar survey
  5. S5Solar assessment

electrical

  1. E1Line patrol: what you can see
  2. E2Insulators and wires close up
  3. E3Thermal patrol: hot connections
  4. E4Clearance and vegetation
  5. E5Substation inspection
  6. E6Electrical assessment

wind

  1. W1Tower and lower blade
  2. W2Blade close-up
  3. W3Nacelle and hub: thermal and oil
  4. W4Heights and tip clearance
  5. W5Wind turbine assessment

structures

  1. B1Facade survey
  2. B2Flat roof survey
  3. B3Telecom tower audit
  4. B4Storage tank inspection
  5. B5Structures assessment

bridge

  1. BR1Viaduct: piers at the river
  2. BR2Viaduct: under the deck
  3. BR3Viaduct: bearings, joints and clearance
  4. BR4Arch bridge: steel arch and stonework
  5. BR5Bridge assessment (both bridges)